This website uses cookies in order to identify and measure the number of visitors to the Website, monitor visitors' navigation in the Website and record the content searched by users. For further information about the cookie policy click more.

Design of Treated Waste Water Pumping Station, Potable Water Pump Station, KSA

See all projects

SALFO is providing design services to Saudi Industrial Property Authority (MODON) for Al Kharj, Sudair and Jeddah 2 Industrial Cities.

The scope of works for the Project includes the following services:

  • Design of the pumping stations for the Wastewater Treatment Plant (to pump wastewater treated effluent into the irrigation network) for the following sites:
    • o AI Kharj Industrial City
    • o Sudair Industrial City
    • o Jeddah 2 Industrial City
  • The design of the pumping station for the Water Treatment Plant (to pump potable water into potable water network) for the following sites:
    • o AI Kharj Industrial City
    • o Sudair Industrial City
  • Interconnection with the existing pipeline and piping at the treatment plants sites.
  • Modification of existing MODON compounds to fit the new pumping stations
  • Connection to power supply network inside the treatment plants sites
  • Incorporation of the pumping stations into existing SCADA systems
  • Preparation of the Tender Documents for the Scope of works
  • Tendering Services including the site visits, answering the bidders’ clarifications and preparation of Circulars and Addenda

Evaluation of Bids and preparation of technical and financial evaluation report