Bulk Liquid Storage Terminal Facilities, Salalah Port, Oman

See all projects

Mina Petroleum FZE –Mina Group has been awarded by the U.S. Department of Defense’s Defense Logistics Agency a five-year contract plus a five year option to build and operate a 230,000 cubic meter Bulk Liquid Storage Terminal Facilities at the Port of Salalah in Oman and have to commission the terminal with a Jet Fuel & Marine fuel pipeline (4 pipelines of approximately 3.5 KM each) up to the pipeline corridor / liquid jetty.

 

The storage tank facility includes 9 tanks with associated facilities Ship Loading / Off-loading, which transfer fuel products FND76 and JP5 from the Jetty Terminal to the new storage facilities, by means of a new Booster Pump station, which will be located at a certain distance outside the tank farm. Transfer rate: from ships 8.000 BBL/H, from barges 2.000 BBL/H, with four 18” pipelines. Area of the plot plan is approximately 58.345 sqm2

 

SALFO was awarded by Mina for the all the engineering services, with execution of the Basic Design, FEED and Detail design of the project total procurement & commissioning support to the Contractor.

 

The project consists of a tank farm (9 bulk storage tanks according to API 650), 4 pipelines of approximately 3.5 KM each, truck loading station, sub-station, pump stations, supporting buildings and roads, electrical, drainage and  firefighting facilities

 

The design also consists of the Concept Design and Detailed Design with Construction Drawings for the full architectural, structural and MEP design of Supporting Buildings and Landscaping. The design shall be developed to the Best International Practices and Omani regulations.