This website uses cookies in order to identify and measure the number of visitors to the Website, monitor visitors' navigation in the Website and record the content searched by users. For further information about the cookie policy click more.

Accommodation Camp, Oman

See all projects

SALFO together with ACS and EHAF was awarded to carry out and complete the Front End Engineering design and guideline for an EPC Contractor to construct separate camp accommodation for CCED in block 3 and 4. The requirement was to provide CCED all necessary Engineering Study, Concept, SoW and drawing layout to enable CCED to float an EPC package to qualified companies.

The Engineering consultancy company scope of work will be to prepare and provide necessary engineering documents to CCED to further use as a baseline for construction phase and shall include and not limited to the following:

-        Provide FEED for the 3 permanent

-        Provide optimum design practice

-        Ensure the design is in accordance to all related Omani regulations and Standards

-        Provide typical Drawings for:

  • Camp Layout
  • Accommodation Layout
  • Recreation layout
  • Kitchen facility layout
  • Offices Layout

-       To provide to EPC contractor SoW including but not limited to:

  • EPC contractor responsibility
  • Material selection
  • Standards and Codes to be followed
  • Project management guidelines
  • Quality philosophy
  • HSE philosophy

-         The camp will include the following facilities

  • Accommodation camp for 1000 people
  • Recreation facilities
  • Camp maintenance warehouse
  • Mosque
  • Parking area
  • CCED camp office
  • Laundry room
  • Clinic
  • Guard house
  • Fire brigade Shelter
  • Fire and gas system
  • Kitchen and Mess hall
  • Power generator